Showing posts with label Fulmar test swatch KAL. Show all posts
Showing posts with label Fulmar test swatch KAL. Show all posts

Tuesday, September 18, 2007

The test swatch for Fulmar is done, washed and measured. Did you notice it is red, not blue? I have so many sweaters in blue and none in red so switched to crimson Wendy Guernsey five ply using a 2.75mm Inox circular. For the test, I knit 18 stitches in check rib, 18 stitches in Chart B, 20 stitches in Chart C, 18 stitches in Chart D (reverse of B) and 16 stitches in Chart E for a total of 90 stitches. The swatch after washing is 10".



The check rib measured 2-1/2"
Chart B is 1-3/4"
Chart C is 2"
Chart D is 1-3/4"
Chart E is 2"
Amazingly enough it adds up to 10".

Note in the photo below that the ribbing does flow into the body of the sweater. In order to make it work, I did NOT increase between the ribbing and the body. As I'm "hippy", having the ribbing and the body the same number of stitches doesn't bother me at all



The knitting sequence on the sweater goes Check rib, B,C,D,E,B,C,D,E,B,C,D,Check rib. Using the measurements I got for each chart,the sweater front (or back) would measure 25-1/2" or 51" total. I'm knitting the small which is supposed to measure 45" and I'll be getting 51". The only way to control this would be to cut way back on number of stitches in the check rib.

So I'm pretty set for the Knit Along starting on October 1st. I've wanted to make this sweater for a long time and thanks to Theresa, the KAL list mom, I'm going to make it.