Sunday, May 28, 2006
The FLAK is done!!! I've not had a sweater fit me so well before and it isn't even blocked yet! The photo makes it look a bit out of square but it isn't really. I learned a lot making this sweater and look forward to making another one with different cables. I added cables down the side where a seam would have been under the arms if this hadn't been knitted in the round.
I've been skimming Janet's new Aran design book and an anxious to start a new Aran. However I WILL wait until I have finished the SFC Fair Isle. This FLAK took 8 skeins of 220 yard skeins of Cascade 220 in a royal blue type color. I would use this yarn again for an Aran as it does show the cables well.
80 degrees today in Maine so won't be using this sweater for awhile. Will get it blocked and ready for fall. Thanks for all the encouragement and participation from the FLAK group.
Thursday, May 11, 2006
We're back from our RV trek down south to visit my mom and test out the new truck camper. Mom is physically much better in the two months she has been in the assisted living center. It is amazing what nutritious food prepared for you and served with no work on your part will do. She's gained some weight, is more stable and doesn't need the walker anymore. She's miserable being there but it is currently the best place for her. We took her out for most of 5-6 days doing fun tourist things and lots of family time.
See the RV trip at http://otrafrommaine.blogspot.com/. I'm having problems posting photos to that site but will keep trying. Not a lot of knitting was done on the trip as we stayed so busy outside. Basically we ate supper and slept! I was able to get about six inches done on the body of FLAK and am pretty pleased on how it is coming. Don't like my bind off row on the neckline but didn't sew in the yarn tail so will get another chance at it. It just seems to roll too much - course it isn't blocked yet either. I added a braid and two side honeycombs down the center on each side under the underarm. It's so much fun just playing with design on this FLAK. I cannot wait until I start the next one after I work my way through Janet's new book. Took the book on the trip also but it's a heavy book and I hit myself in the face a couple of times going to sleep while trying to read it - snooze!
I took the SFC Fair Isle Shirt Tail Hem sweater with me also but never got but about 5 rows done. No way could I knit that one, watch the scenery and follow a chart at the same time. I could knit on FLAK as the cables are easy to memorize. Now that we are home and there is a week of rain coming that will keep us out of the perennial garden cleanup, I should get back to both projects. Poor Spring Forward sweater is a distant third at the moment, but will be finished.
Subscribe to:
Posts (Atom)